HCMC MRT LINE 1

HCMC MRT LINE 1

Alignment: Ben Thanh (Quach Thi Trang Square) – Le Loi – Nguyen Sieu – Ngo Van Nam – Ton Duc Thang – Ba Son – Nguyen Huu Canh – Van Thanh – Dien Bien Phu – Sai Gon Bridge – Ha Noi Highway – Long Binh Depot.

–  Total length: 19.7 km (2.6 km underground and 17.1 km elevated).

–  Number of station: 14 stations (3 underground stations and 11 elevated stations).

–  Depot and workshop at Long Binh Ward, District 9 with an area of 20 ha.

–  Project cost (estimated): 2.491 billion USD.

Location of Project: HCMC, Vietnam
Application time: 2021
Project Owner: MAUR – People’s Committee Of Ho Chi Minh City
Main contractor: GS E&C
Designer: NJPT
Project type: Government infrastructure
Products/System Used: FLEXATEC 1000 – FIREFLEX 2000 by VEXCOLT