Nghi Son 2 Power Plant
The new power plant will be built, owned and operated by the special purpose company, Nghi Son 2 Power Limited Liability Company (NS2PC), which is a 50:50 joint venture between Marubeni Corporation and the Korea Electric Power Corporation (KEPCO).
Estimated to cost $2.79bn, the Nghi Son 2 thermal power plant will consist of two super critical coal-fired power generating units.
Construction on the project is scheduled to begin by the end of 2018, while full commissioning is expected in July 2022.
Location of Project: Thanh Hoa, Vietnam
Application time: On-going
Project Owner: KEPCO
Products/System Used: Chartek 2218- Epoxy Intumescent (UL 1709), Interkote 1560 –High density cementitious fireproofing